PLC control systems
Program architecture, standards-based function blocks, safety interlocks and a documented I/O list you can maintain after we leave.
SERVICE 02
The program that runs the plant.
Scope of works
Legacy upgrade and plant migration, DCS and PLC programming, SCADA and HMI development and complete control system integration — built on industry-standard platforms with full traceability.
Siemens · Rockwell · Honeywell · Archestra
In detail
What actually gets engineered, built and signed off under this service.
Program architecture, standards-based function blocks, safety interlocks and a documented I/O list you can maintain after we leave.
Operator screens built around the task, not the tag list. Alarm rationalisation, trending, historian tie-in.
Sequence design, recipe and batch handling, VFD and servo integration, machine safety to the required category.
Legacy upgrade
When spares run out and the programming software only runs on one old laptop, we take the plant to a current platform without a rewrite from scratch and without an extended outage.
S5 and S7-300/400 to S7-1500 on TIA Portal. Proven logic converted and restructured into maintainable function blocks, PROFIBUS moved to PROFINET, HMIs rebuilt in WinCC Unified.
PLC-5 and SLC 500 to ControlLogix or CompactLogix on Studio 5000. Conversion kits keep existing terminations in place so changeover fits a planned shutdown; HMIs rebuilt in FactoryTalk View.
Moving between vendors in either direction. The control philosophy, interlock matrix and I/O list are documented platform-independent first, and the new program is written against that, so sequence behaviour stays identical and operators get a familiar plant.
| Ref | What a legacy estate costs you | Consequence | Severity |
|---|---|---|---|
| R-01 | No spares, no support | Controllers installed decades ago are past end of life. Replacements come from grey-market brokers with no warranty and long lead times. | Critical |
| R-02 | Nobody can touch the logic | The original program often lives on one surviving laptop running obsolete software — undocumented, edited for years by engineers who have since left. | Critical |
| R-03 | Audits and data both fail | Flat, unauthenticated control networks fail cybersecurity review. Ageing controllers can’t feed the MES, historian and analytics you’re investing in. | High |
Send us the scope and we’ll put an engineer on it, not a salesperson.